Brezac Constructions has purpose built a production facility within the Crestmead Industrial Estate.
- The ability to achieve 12,000 man hours a month
- 3000 m2 under roof
- 7 meters under hook
- 3 x 10 tonne overhead cranes
- 1 x 5 tonne overhead crane
This facility has been built with production efficiencies in mind.
The facility includes:
- Drive-through capacity enabling one-way semi-trailer circulation onsite and within the building
- The ability to achieve 12,000 man hours a month
- 3000 m2 under roof
- 7 meters under hook
- 3 x 10 tonne overhead cranes
- 1 x 5 tonne overhead crane